Program
Museum for housing the permanent collection and for hosting tableware events/exhibits at the manufacturing site. Planning and installation of museum's sales counter.
Governing Authority
"Saint-Louis Cristal/Lumière en Pays-de-Bitche" Association
Client
Cristal Saint-Louis
Project manager
Lipsky+Rollet architectes with Catherine Fleury (design documents) and Laurent Thierry (construction documents and site supervision), in collaboration with SFICA (engineering), Gaujard technologie (wood construction), Philippe Délis (scenography), Marcel Meyer in collaboration with Philippe Délis (museography), Bureau Michel Forgue (quantity surveyor)
Signs and markings
intégral Ruedi Baur & associés
Total cost
1 780 820 euros HT
Surface area
945m² sqm
Delivery
2007
Tool building
-
Lendit Studios
Plaine-St-Denis 2010
-
Saint-Louis Crystal Museum
Saint-Louis 2007
-
Biotechnology Start ups Incubator
Nantes island 2006
-
Sustainable Quarter Astus
Villefontaine 2019
-
Cité du Développement Durable, Grands Ateliers
Villefontaine 2002
-
Fabric printing of the Grand-Lemps
Grand-Lemps 2002
-
National Choregraphy Center
Montpellier 1996
-
Theatre "la Comédie" (competition)
Saint-Etienne 2011
-
Halle Pajol (competition)
Paris 2007
-
Maillon Theater (competition)
Strasbourg 2013